I. Check list item preparation for bunkering
1. Plug up each coaming for F.O. Tank air vent & hose connection
2. Plug up all scupper on upper deck
3. Prepare tranceiver or telephone
4. Prepare necessary tools & emergency goods at nearby hose connection: Spanner,  Waste rug,  Oil pan,  Sounding scale,   Reducer,  etc.
5. Prepere hose davit & Jacob's ladder
6. Following notice shall be hanged onto nearby bunkiering station:   Oil Transfer Procedures,  Pipe Line Diagram,  Oil Pollution Prevention Station, Bunkering Station,  Bunkering Plan  &  Inflammables
7. Prepare fire extinguisher & chemical emulsifier
8. Prepare working light in case of night time
9. Fit on pressure gauge to filling line
10. Confirm operation of remote control valve
11. Put in F.O. Additive if necessary
12. Set up bunkering line (confirm switch off F.O. transfer pump )
II. Check list during bunkering
1. Hoist a B flag
2.  Red Light in case night time
3. Confirm hose connection ( oil leak, etc.)
4. Condition of valve operation & oil level in receiving tank
5. Carry out  duty & an adequate place by bunkering station
6. Again confirm bunkering line
7. Sounding of oil in receiving tank (every 5 min.)
8. Sounding of oil in not receiving tanks (ever. 15 min.) and received tanks which valve are closed.